Hmm i never noticed a visual indicator for the head lift. I can see the blue hologram and some sort of “waves” starting from the pump hologram. Assume, I have build a industrial tank on the bottom, 0 meter’s above the ground. From there the pipeline starts straight upwards, for example 20 meter’s. Where should I place the first mk II pump? At 3 meter’s or later?
Ok, many thx for all your suggestions. I will try therm tomorrow.