[T]he report’s executive summary certainly gets to the heart of their findings.

“The rhetoric from small modular reactor (SMR) advocates is loud and persistent: This time will be different because the cost overruns and schedule delays that have plagued large reactor construction projects will not be repeated with the new designs,” says the report. “But the few SMRs that have been built (or have been started) paint a different picture – one that looks startlingly similar to the past. Significant construction delays are still the norm and costs have continued to climb.”

    • Telodzrum@lemmy.world
      link
      fedilink
      English
      arrow-up
      0
      arrow-down
      2
      ·
      6 months ago

      Actually, none of them do. This other guy is insane and no one gets a reactor in their basement, but we have neither the production capacity nor the time to avoid nuclear being a significant portion of all energy in a fissile free future.